Products

Factory Cheap Hot Repair Tape - fix tape – ASN

Short Description:


Product Detail

FAQ

Product Tags

Related Video

Feedback (2)

go on to boost, to be certain item quality in line with market and buyer standard demands. Our firm has a excellent assurance procedure happen to be established for Kafo Knee Ankle Foot Orthosis, Fluorescent Probe Pcr, Double Dipped Pvc Gloves, We are looking forward to building positive and beneficial links with the companies around the world. We warmly welcome you to contact us to begin discussions on how we can bring this into being.
Factory Cheap Hot Repair Tape - fix tape – ASN Detail:

Features:

 • Catalyst: Water

 • Resin Makeup: Polyurethane

 • Heat Resistance: 180°C

 • Pressure: 2175 PSI

 • Bonds: Copper pipe, PVC, polypipe, metal, fibreglass

 • Set Time: 20– 30 minutes, sets under water

 • Chemical resistance: Most diluted chemicals and fuels

 1.Resists cold and hot temperatures

 2.Easy to apply, no mixing or messy clean up

 3.Resistan to water, acid, salts, or soil organics

 4.Can be applied underwater or to wet surfaces

 5.Quick, long term protective coating, ready for immediate service

 6.Non-toxic and acceptable for portable water lines

20

Technical Data

 ♦ Useable life: 2-3 minutes, depending on temperature of water and pipework

  ♦ Intial cure time: 5 minutes

  ♦ Full cure time: 30minutes

  ♦ Shore D hardness: 70

  ♦ Tensile strength: 30-35Mpa

  ♦ Tensile modulus: 7.5Gpa

  ♦ Maximum service temperature: 180° C

  ♦ Pressure resistance:400 psi (Min wrapping 15 layers around cracked/leaking area)

Application

1. Once the leaking area is identified, shut down relevant pipes or hoses immediately.  Prepare the surface by cle aning and roughening the pipe.

2.Put on enclosed latex gloves. Apply Steel Putty to the leak site and mould. 

3.Open foil pouch and immerse bandage in temperate fresh water for 5~10 seconds.The entire contents must be used once the package is opened. 

4.  Apply around the damaged area extending up to 50mm either side of the leak to ensure complete coverage.

5. As curing begins once it is taken out of the water. Whilst wrapping, pull each layer tightly by using your hand to mould and squeeze the layers 

together. Continue this action during and upon completion. 

Packing & Shipping

Packing:        Carton packaging

Delivry time:  within 3 weeks from order confirmation date

Shipping:       By sea/air/express


Product detail pictures:

Factory Cheap Hot Repair Tape - fix tape – ASN detail pictures


Related Product Guide:

Being supported by an highly developed and specialist IT team, we could give technical support on pre-sales & after-sales service for Factory Cheap Hot Repair Tape - fix tape – ASN , The product will supply to all over the world, such as: Iraq, London, Netherlands, With the goal of "zero defect". To care for the environment, and social returns, care employee social responsibility as own duty. We welcome friends from all over the world to visit and guide us so that we can achieve the win-win goal together.
  • The sales person is professional and responsible, warm and polite, we had a pleasant conversation and no language barriers on communication.
    5 Stars By Ada from Swiss - 2018.09.23 18:44
    The factory technical staff gave us a lot of good advice in the cooperation process, this is very good, we are very grateful.
    5 Stars By Heather from Maldives - 2017.03.28 16:34
    Write your message here and send it to us